Acorn Drive
|
|
Progress as of Feb 2024
- Kitchen and Bath mostly complete
- Started front porch and rear deck
- Doors (Garage access & pocket doors) installed
- Bunks built and heater installed
- Living space primed and painted
- Drywall Complete.
- Shower panels installed
- Insulation and drywall installed in bath and bedroom
- Rough Plumbing is complete and pressure tested.
- Rough-in electrical complete, plan is to have off-grid solar solution that could power a mini split.
- Framing is complete, including the rough-in of two pocket doors.
Other Acorn Projects
DIY Energy Recovery Ventilation: Energy recovery process in HVAC systems that exchanges the energy contained in normally exhausted air of a building or conditioned space, using it to treat the incoming outdoor ventilation air.
Fabricated with scrap material from the signage shop with 3D printed brackets for the Coloplast energy exchanger.
Fabricated with scrap material from the signage shop with 3D printed brackets for the Coloplast energy exchanger.
Custom Shower Panel
Designed, printed, and cut Max metal panels for the shower |